Construction of fittings inside the tank, between the pump and the discharge nozzle. Non-return valve (6/4"), ball valve (6/4"), pressure-rated hose, clamps, gland for electrical cable passage, pump lifting rope and holder. These are installed in the shaft under factory conditions.
This item can only be ordered together with a lifting shaft!
Product description
Construction of fittings inside the tank, between the pump and the discharge nozzle. Non-return valve (6/4"), ball valve (6/4"), pressure-rated hose, clamps, gland for electrical cable passage, pump lifting rope and holder. These are installed in the shaft under factory conditions.
This item can only be ordered together with a lifting shaft!
Shipping information
The delivery of the ordered product takes place within 10-15 working days from the conclusion of the contract (if any, from the payment of the advance payment), at a pre-arranged time. We would like to draw your attention to the fact that our company does not transport its containers with a crane, so we ask that you kindly help our driver to roll the container.