Preparation of planning documentation 41/2017. (XII. 29.) in accordance with BM decree. 72/1996. (V. 22.) On the basis of a government decree, the licensing of water installations not exceeding 500 m3/year falls within the scope of the locally competent notary. Since the equipment has a CE conformity mark, only the leakage field/hill needs to be approved.
GRÜNWALD equipment sized from 4 to -15 LEP have an output of less than 500 m3/year, so we prepare design documentation for them.
For the preparation of plan documentation, the customer provides a copy of the map and a copy of the title deed. We prepare design documentation exclusively for GRÜNWALD equipment.
The design documentation does not include any other studies, impact assessments, or soil mechanics expert opinions required by the relevant authorities.
Product description
Preparation of planning documentation 41/2017. (XII. 29.) in accordance with BM decree. 72/1996. (V. 22.) On the basis of a government decree, the licensing of water installations not exceeding 500 m3/year falls within the scope of the locally competent notary. Since the equipment has a CE conformity mark, only the leakage field/hill needs to be approved.
GRÜNWALD equipment sized from 4 to -15 LEP have an output of less than 500 m3/year, so we prepare design documentation for them.
For the preparation of plan documentation, the customer provides a copy of the map and a copy of the title deed. We prepare design documentation exclusively for GRÜNWALD equipment.
The design documentation does not include any other studies, impact assessments, or soil mechanics expert opinions required by the relevant authorities.
Shipping information
The delivery of the ordered product takes place within 10-15 working days from the conclusion of the contract (if any, from the payment of the advance payment), at a pre-arranged time. We would like to draw your attention to the fact that our company does not transport its containers with a crane, so we ask that you kindly help our driver to roll the container.